Darlington rail travel: Past, present and future. Part Two: New commuter services
In Part Two, I’m going to propose the reintroduction of rail services across Darlington, centred on Bank Top railway station The post Darlington rail travel: Past, present and future. Part Two: New commuter services appeared first on Bylines Network.

In Part One, I described the history of Darlington Bank Top railway station; from the vast network that existed at the turn of the 20th Century, to the rump network that remained after almost 30 years of cuts from 1939 onwards.
Emergency on Planet Earth
In Part Two, I’m going to propose the reintroduction of rail services across Darlington, centred on Bank Top railway station. I’ll list the proposals in order of complexity, starting with the simplest, a new station at Ingenium Parc.
Ingenium Parc
A new railway station will serve Ingenium Parc, a business park under construction in the east of Darlington. Some readers may recall the nearby ill-fated Morton Palms railway station, which would have served Morton Palms Business Park. This station was first proposed in 2006 as part of a putative Tees Valley Metro system. The Tees Valley Metro was ill-conceived and impractical; the financial crash of 2008 put it out of its misery. You can read about a much more ambitious version here. Now that work has started on yet another new business park, it’s time to reconsider a new railway station in the vicinity.
But where?
I visited the area on 13 November. I headed south from Yarm Road along Salter’s Lane. The road passes the Cummins Engine Plant.

Just past the Cummins Plant, the first unit of Ingenium Parc is under construction.

Let’s build it here
Salter’s Lane then continues south as a public footpath until you reach the Darlington to Saltburn railway line. A footpath crosses the railway line here. The new railway station would be located about 200 metres west of the level crossing, which can be seen in this photo.

Here’s a map showing the proposed new station and the surrounding area.

A great place to build a railway station
The proposed station would also serve Morton Palms Business Park, the Firth Moor district, and Mowden Park Rugby Stadium. There is a network of public footpaths here, but these have been neglected by Darlington Council. The orange lines on the map show where additional footpaths would need to be built. The path across the railway has been temporarily closed due to the construction of the new business park. A sign diverts you on to a former farmer’s bridge across the railway. This is where Ingenium Parc Railway Station would be built. But the diversion is impossible to follow because the path is overgrown with brambles.
Let’s rock!
Ingenium Parc would be a useful station for attending gigs at Mowden Park Rugby Stadium, also known as the Darlington Arena. Would the new station be open in time for the Foo Fighters‘ gig at the arena on 14 September 2027? Probably not, but why not enjoy this?
Two new stations on the Bishop Line
The next project would be more difficult to achieve, because it would require the doubling of the Bishop line, between Parkgate Junction and Heighington. The second platform at North Road station would be reinstated. The existing platform would also need to be replaced due to its low height, something that should have been addressed decades ago. I visited the site of the proposed new stations on 14 November, starting at North Road. There was a Steampunk Festival taking place at the neighbouring Hopetown Museum. Pro tip: Use a parrot for navigation whenever possible.

Robert Stephenson & Hawthorns Limited
I nipped up to Morrison’s on North Road for breakfast. “Stivvies’ Clock” has been attached to the newer supermarket building. The clock is one of the relics of Robert Stephenson & Hawthorns Limited’s locomotive factory, known locally as “Stivvies”, which once stood here.

Whessoe Road
I headed along Whessoe road, taking a quick diversion to the 1861 Shed to see what’s happening. The North East Locomotive Preservation Group is refurbishing the saddle tank from Locomotive BR J94 68030. which can be seen on the left.

Rise Carr Railway Station
I returned to Whessoe Road and headed north to the junction with Lingfield Road. Rise Carr, the first of two new stations to be built on Whessoe Road, would be located next to the Lingfield Road junction, which can be seen below.

Take me high
The station would be built on the embankment. The pedestrian entrance would be between Fletcher Joinery and North Park House. Platform 1, for trains to Darlington Bank Top Station, would be located nearest to the camera. The second platform, for services to BIshop Auckland, would be accessed via a pedestrian underpass. In addition to serving the Harrowgate Hill area, a proposed footpath would link Rise Carr Railway Station to Faverdale Industrial Estate. Residents of Brinkburn would be able to access the station via the Faverdale Black Path and Elmtree Street.
Whessoe Railway Station
I continued up Whessoe Road to the site of Whessoe, the next proposed railway station. However, the road beyond this point doesn’t have a pavement, and it wouldn’t have been safe to continue. The proposed station would be about 300 metres north of here.

The dreaded “garden village”
The new station would be located next to the junction of Whessoe Road and Burtree Lane. It would serve Burtree Garden Village, which will eventually contain 2,000 houses. Hellens Group, the company behind the garden village, and Darlington Council, which authorised this vast housing estate, made no allowances for a railway station to alleviate the car-dependency of the development. Whessoe station would also serve two other housing estates that are also planned for this vicinity. These are Beaumont Grange and Berrymead Gardens. The two new proposed stations can be seen on the map below, along with the proposed Infinium Parc station at the bottom right. The map also displays a proposed station at Harrowgate Hill. Details of this will be contained in Part Three of this article. Finally, the map shows the next project up for discussion, a restoration of the railway line to Branksome.

Railway to Branksome
The next proposal is to reopen a short stretch of the Barnard Castle Line. Here’s a reminder of the map of railways in County Durham from Part One of this article. The “Barney” Line can be seen running along the bottom of the map, from Darlington Bank Top station on the right hand side.

Branksome Line
This proposal is to reopen a short stretch of the Barney Line, to be known as the Branksome Line, from the former Hopetown Junction, just beyond North Road Station, almost to the A1(M) motorway at Branksome. I visited the route of the proposed line on 14 November, starting at Whessoe Road. I headed down Elmtree Street, crossed under the Bishop Line, then turned around and took the photo below. To the right, the colossal former Rise Carr Rolling Mills can be seen. A symbol of Darlington’s proud engineering legacy, these were latterly known as the Darlington & Simpson Rolling Mills, then British Steel, before closing in 1998. The route back to Whessoe Road can be seen under the railway bridge. The proposed Rise Carr Station, mentioned earlier, would be just out of sight to the left.

Stooperdale Junction
I headed along the Faverdale Black Path to the site of Stooperdale Junction, where the Barnard Castle Line formed a junction with the loop line coming from the north. This entire area was once a busy hive of railway engineering activity. Rise Carr Rolling Mills appear in this photo too. They dominate the local landscape.

Plenty of room
The reopened railway would follow the route of the Faverdale Black Path. The railway formation is wide here, and there’s a parallel cycle path. To reinstate the railway line, the footpath and cycle path would need to be merged together. But some trees would have to be removed to allow for both routes. In the photo below, looking west, the cycle path can be seen running away from the camera. The Faverdale Black Path can be seen next to the green boundary fence on the right. Faverdale Industrial Estate is on the other side of the fence.

Underpass
In addition to reinstatement of the railway, there would need to be three or four underpasses to allow walkers to access different parts of what is, in effect, a linear park. One of the abutments of a former underpass can be seen below. This underpass would be restored.

West Auckland Road
The black path soon meets the A68 West Auckland Road; The Barnard Castle Line once crossed this road on a bridge. The western abutment of this bridge can be seen in the photo below. The first of the stations on the reopened railway line, Faverdale, would be to the right of the photo, and the bridge across the road would be reinstated. Faverdale Station would serve the Cockerton and Brinkburn districts, and also the vast Faverdale Industrial Estate.

A hidden railway
After continuing north along West Auckland Road for about 100 metres, I picked up the black path again. The land gradually rises here, and the Barnard Castle Line entered a shallow cutting.

West Park Station
The second new station on the Branksome Line would be located here. West Park Hospital is just out of sight to the right. The three stations on this line would be spaced closely together. I’ll explain more about this later. In addition to serving the hospital, West Park Station would be accessed from Branksome, to the south, and the vast West Park Garden Village to the north. The garden village is still under construction. As with all garden villages, such as Burtree mentioned earlier, it was designed to be car-dependent; Under this plan, not only would West Park Garden Village get a much-needed railway station, but it would get two.
Newton Lane
I reached Newton Lane, the main obstacle in getting this railway line reinstated. The restored line would need to cross Newton Lane on either an overbridge or an underpass. A bridge would be visually intrusive, so an underpass would probably be needed. This would be expensive to construct, and there would be a lot of disruption.

Branksome Railway Station
The track bed of the Barnard Castle Line continues west. After another 200 metres, I arrived at the site of the proposed Branksome Railway Station, which would be the end of the line. In this view, looking back west over the route of the railway, the new houses of West Park Garden Village can be seen on the left, and housing in Branksome can be seen to the right.

Why build this railway?
There would be numerous benefits from a railway in this part of Darlington. The bus services are slow and unpredictable. Branksome suffers from urban deprivation, and a fast, frequent and comfortable route to the town centre would provide work, education and leisure opportunities. And, yes, this would be the second railway station serving West Park Garden Village.
But what about the noise and air pollution?
The trains would be battery powered. They’d be similar to the ones recently ordered for TransPennine Express (TPE). The Branksome Line trains would be lighter and less complicated than the TPE ones though, because they wouldn’t need to draw power from Overhead Line Equipment. The batteries would be re-charged at Darlington after each journey. Lightweight electric trains running on continuously welded tracks don’t make much noise, and there’d be zero air pollution.
Why are the railway stations sited to close together?
Electric trains are capable of rapid acceleration and deceleration, which allows railway stations to be closer together; the Branksome Line would be a metro-style railway. The trains would also call at North Road station, obviously, on the way to Darlington Bank Top. In Part Three of this article, I’ll describe how the Branksome Line would fit into the existing network.
Is this really the end of the line?
Not quite. I continued west for a few minutes, and reached the site of yet another former rail junction. At Merrybent Junction, a freight line branched away from the Barnard Castle Line, and headed south. It reached as far as Barton Quarry, about six miles away. Here’s how Merrybent Junction looks today, with the former freight line on the left and the “Barney” line to the right.

The Durham Motorway
Just beyond Merrybent Junction, a section of the A1(M) was built, starting in 1963. The road builders got lucky. The Merrybent freight line had closed in 1938, so the motorway reused six miles of the route of the former railway almost as far as Junction 56. They only had to demolish a couple of buildings along the entire route. When the road builders commenced work, the Barnard Castle Line was still open to freight trains, so they built a bridge across it. By the time the road opened in 1965, the Barney line had closed. So, future railway builders have gotten a lucky break too, because the road builders left a valuable legacy behind. If the railway ever gets extended beyond Branksome, the railway engineers won’t have to build an expensive new bridge.

Speaking of which
In Part Three of this article, which will be published on 26 November, I’ll detail proposals to expand Darlington’s railways beyond the boundaries of the town. This will include reinstatement of the route to Barnard Castle, and three other lines emanating from Darlington Bank Top station.
Thanks to James Waterson for providing additional research for this article
Further Reading
Darlington rail travel: Past, present and future. Part One: A famous past
The post Darlington rail travel: Past, present and future. Part Two: New commuter services appeared first on Bylines Network.